Under the contract UEC-Gas turbines (Rybinsk) will manufacture and supply six GTN-16R-PS-12 gas pumping units each rated at 16 MW for the operation on the site of booster compressor station. Gas pumping units were designed around PS-90GP2 gas turbine engines developed by UEC-Aviadvigatel.