REpower: Contract for 51 MW for wind farm project in US signed.The REpower MM92 turbines, each with a rated power of 2.05 megawatts (MW) and a hub height of 80 meters, are destined for one of EverPower’s development projects located across the US states of New York, Ohio, Pennsylvania and Washington. EverPower has advanced stage projects totaling more than 600 MW of capacity targeted for construction over the next three years. The 25 turbines will have a total power output of 51 megawatts. They are to be delivered in summer 2011 and commissioned by the end of the same year. Each turbine produces up to 6.5 million kilowatt hours (kWh) of wind electricity per year. This is the first project between EverPower and the German-based wind turbine manufacturer’s USA subsidiary. In addition to installation and commissioning the turbines, REpower and EverPower have entered into a long term service and maintenance agreement.
Дата публикации:
Tue, 12/28/2010
Хранить в архиве:
Xранить |
Search |
|
© Все права защищены, ООО «Турбомашины», 2005-2024.
Вся информация, опубликованная на веб-сайте turbine-diesel.ru, является интеллектуальной собственностью ООО "Турбомашины". Никакие опубликованные на сайте материалы не могут быть воспроизведены в той или иной форме печатными изданиями, телеканалами и радиостанциями без ссылки на журнал "Турбины и Дизели", а другими сайтами, в т.ч. сетевыми СМИ, не могут быть использованы без активной гиперссылки на turbine-diesel.ru и ссылки на журнал "Турбины и Дизели". При воспроизведении опубликованных материалов письменного разрешения от администрации настоящего сайта не требуется.
Ответственность за содержание размещенных на веб-сайте рекламных объявлений, в т.ч. баннеров, несет исключительно рекламодатель. За содержание сайтов, на которые приводятся гиперссылки, ООО "Турбомашины" ответственности не несет.
|