Combined cycle power station was put into operation on the site of Voronezhskaya TETs.

The station consists of two GE Energy LM6000 PD Sprint each rated at 45 MW, two ÊUP-75-3.9-440 heat recovery steam generators, manufactured by Yuzhtransenergo AK and PT-25/34-3.4/1.2 steam turbine rated ate 25 MW delivered by Kaluzhsky Turbine Plant.

The station equipped with MARK VI Speedtronic control system. Enerproject EGSI-S-300/1000-100/1000 WA fuel gas treatment plant with output of 13 000 m3 per hour was delivered by Energas Ltd. The customer of the project is Kvadra JSC.

Дата публикации: 
Wed, 01/19/2011
Хранить в архиве: 
Xранить