Autonomous power plant will be commissioned in Zarechye microdistrict in Moscow Region.

Under the contract Avtonomny Energoservice delivered two GE Energy Jenbacher gas engines JMS 320 NL cogeneration power plants each rated at 1053 kW for the first stage of the project.

Under the second stage it is planned to increase the number of gas engine plants on the station up to six. The station also includes two stand-by diesel generating sets Gesan DVAS630E designed on the base of TAD1642GE diesel engine and Stamford HCI534E/544E electric generator. Diesel generating sets are mounted in sound-proof containers and installed in the station building.
Gas boiler-house with output of 5 MW on the base of Calortec (Finland) TKH-TVO-10 boilers operate as a part of the station.