Power supply for Asiada-2011 sports competition.

Fourty diesel generating sets with total electric output of 7.64 MW from rental fleet of Hited and Hited-Kazakhstan generated electric power for the needs of opening and closing ceremony of Seventh Winter Asian Games of 2011. Some synchronized power complexes uninterruptedly operated during 45 days. Forehanded diesel fuel delivery was organized to all objects.

The equipment operation was permanently controlled by engineers of Hited. They laid more than 6 kilometers of power cable when the temperature outdoor was lower than 40 °C.

Дата публикации: 
Wed, 07/06/2011
Хранить в архиве: 
Xранить