Gas engine power station is under construction on the site of Krasnoselskaya confectionery (Saint-Petersburg).

The station will consist of three FG Wilson Engineering Ltd. PG620B1 gas engine power plants. Total electric output of the station will be 1.4 MW. It is equipped with Gidrothermal Ltd. waste-heat recovery system with thermal output of 1 MW. The station will also include Broad absorption chiller for cooling power generation.

Дата публикации: 
Thu, 07/21/2011
Хранить в архиве: 
Xранить