Two Capstone C1000 microturbine power stations were installed on the site of Vostochno-Sotchemyu-Talyukskoye oil field (Pechoraneftegas).

 

Capstone C1000 microturbine power station with electric output of 1 MW and efficiency of 33 % was designed around five C200 microturbines manufactured by Capstone Turbine Corporation. The station operates in simple cycle on casing-head gas as a part of local power grid. The operation mode is basic. Main power equipment was supplied by . The station is equipped with booster compressor station.

 