Aviadvigatel JSC and Irkutskaya Oil Company signed the contract for two GTES Ural-6000 gas turbine plants delivery.

GTES Ural-6000 gas turbine power plants will be installed on the site of Yaraktinskoye oil field and will generate power for the needs of field infrastructure. Total electric output of the station will be 12 MW. The main fuel for the station will be casing-head gas. Ural-6000 gas turbine power plants will operate in simple cycle without waste heat utilization.

Дата публикации: 
Thu, 12/08/2011
Хранить в архиве: 
Xранить