Main frames of BMES Korvet-2.5 power plants were constructed on the site of Yamburgskaya compressor station (Gazprom transgas Yugorsk).

The power station will consist of four Korvet-2500-02 complete sets of power equipment. The set includes power unit container, technological unit with fire fighting system, cycle air filtering unit and exhaust system manufactured by Iskra-Avigas JSC. Reconstruction of Yamburskaya compressor station power plant will be carried out on the base of BMES Korvet-2.5 complete sets of power equipment. The station will operate in severe climatic conditions. The lowest temperature during a year is – 56 °C. Power plant will secure power supply to natural gas cooling station and main technological equipment of the compressor station.