Output of gas turbine power station on the site of Yaraktinskoye oil field (Irkutskaya Region) will be increased.

At present two Ural-6000 and six PAES-2500 gas turbine power plants are in operation on the site. In 2013 two more Ural-6000 will be delivered to the site by Aviadvigatel JSC. Total electric output of the station will be increased up to 39 MW.

Дата публикации: 
Fri, 03/15/2013
Хранить в архиве: 
Xранить