![]() | ||
Assembling of auxiliary equipment is underway on the site of Mayakovskaya TES (Kaliningradskaya Region)All works are carried out by Intertekhelectro. At present auxiliary modules of gas turbine plants are installed on the foundations. High-voltage tests of generator stator are finished. Auxiliary power transformers are installed on the foundations. Total electric output of Mayakovskaya TES is 160 MW. The station consists of two 6F.03 gas turbine power plants manufactured by Russian gas turbines Ltd. (Rybinsk). General contractor for the project is Intertekhelectro. The customer of the station is Kaliningradskaya Generation Ltd – joint venture between Rosneftegas JSC and Inter RAO PJSC. Project management fron customer side is realized by Inter RAO – Engineering Ltd.
Дата публикации:
Mon, 07/24/2017
Хранить в архиве:
Xранить |
Search |
|
© Все права защищены, ООО «Турбомашины», 2005-2025.
Вся информация, опубликованная на веб-сайте turbine-diesel.ru, является интеллектуальной собственностью ООО "Турбомашины". Никакие опубликованные на сайте материалы не могут быть воспроизведены в той или иной форме печатными изданиями, телеканалами и радиостанциями без ссылки на журнал "Турбины и Дизели", а другими сайтами, в т.ч. сетевыми СМИ, не могут быть использованы без активной гиперссылки на turbine-diesel.ru и ссылки на журнал "Турбины и Дизели". При воспроизведении опубликованных материалов письменного разрешения от администрации настоящего сайта не требуется.
Ответственность за содержание размещенных на веб-сайте рекламных объявлений, в т.ч. баннеров, несет исключительно рекламодатель. За содержание сайтов, на которые приводятся гиперссылки, ООО "Турбомашины" ответственности не несет.
|