Combined cycle power station was commissioned on the site of Kazanskaya TETs-1.

The station consists of two power units on the base of GE Frame 6FA gas turbine plants each rated at 75 MW, two Uralsky turbine plant steam turbine with electric output of 40 MW and two EMAlliance heat recovery steam generator. The customer of the project is Generating company JSC (Tatarstan Republic). General contractor of the project is Uralenergostroy, general designer of the station is Energoprogress engineering center. T Plus Group carried out engineering support of the project. Globaltechexport completed the station with necessary auxiliary equipment, carried out all civil and commissioning works. The station is equipped with three Atlas Copco booster compressor stations. Total cost of the project is 15.6 bld of roubles.