Main power equipment was installed on the site Nadezhdinsky metallurgical plant (Sverdlovskaya Region).

The project of power station construction is realized by Stark Group of Companies under the contract signed with Nadezhdinsky metallurgical plant PJSC. Total electric output of the station is of 24.9 MW. The station consists of four MWM TCG 2032B V16 gas engine power plants each rated at 4.5 MW. Exhaust gases from the plants are recovered by waste-heat boilers which generate technological steam with the temperature of 192 °C and pressure of 1.2 MPa. The station is also equipped with three boilers for utilization of blast furnace gases and condensing steam turbine rated at 6.9 MW with condensing steam extraction.