Gas engine power station was built on the site of Pavlogradsky chemical factory.

Power station was developed on the base of MWM TCG 2016V12 power plant rated at 600 kW and Ascentec thermal oil boiler each rated at 700 kW. Earlier Interenergo NPP commissioned trigeneration power station on the site. It consists of three MWM TCG 2016V12 gas engine power plant.

Дата публикации: 
Mon, 04/01/2019
Хранить в архиве: 
Не хранить