Equipment of REP Holding is ready for operation at Power of Siberia pipeline.

Three REP Holding GPA-32 Ladoga gas pumping units are installed on the site of Atamanskaya compressor station. The output of each unit is 32 MW. They were manufactured under the contract with Gazprom PJSC.

Дата публикации: 
Fri, 01/24/2020
Хранить в архиве: 
Не хранить