Wind park with total electric output of 150 MW was built in Adygeya.

Wind park consists of 60 L100-2.5MW wind turbines. The project was realized by VetroOGK in cooperation with Lagerwey (the Netherlands). The construction of the park was started in 2018. VetroOGK at present is accomplishing the localization of L100-2.5MW wind turbines production in Russia. In future it is planned to localize the production of L136-4.0MW wind turbine rated at 4 MW.

Дата публикации: 
Tue, 03/31/2020
Хранить в архиве: 
Не хранить