Filter AS supplied eighth JMS 620 GS-S/N-LC power plant to oil processing complex in Astashkovichi settlement (Byelorussia).

Total electric output of the station is 24 MW. JMS 620 GS-S/N-LC gas engine power plants operate on casing-head gas. The customer of the station is Belorusneft RUP PO. General designer of the station is BelTEI RUP, general contractor is Neftespetsstroy JSC (affiliate of Belorusneft RUP PO). The station is equipped with Siemens NXPLUS 6.3 kV and SIVACON 0.4 kV distribution substations. JMS 620 GS-S/N-LC power plants operate on the base mode in parallel with Byelorussian main power grid. 
They are equipped with AVK electric generators.

Дата публикации: 
пт, 01/18/2013
Хранить в архиве: 
Xранить