The project of Shakhtinskaya GTES reconstruction is finished.

The station operates in combined cycle. It consists of two gas turbine plants developed on the base of Zorya-Mashproject GTD-15-02 gas turbines each rated 15 MW, two Pr-45-4.0-440 (P-86-I) heat recovery steam generators and T-12-3.6/0.12 steam turbine. Total electric output of the station is 97 MW.

Дата публикации: 
ср, 03/20/2013
Хранить в архиве: 
Xранить