Gas turbines power station was constructed on the site of Krymsky alkali-works.

Cogeneration power station was developed on the base of Siemens SGT-400 gas turbine plant and Viessmann waste-heat boiler. Electric output of the station is 14.4 MW. All generated power will be used for technological needs of the enterprise. The station is equipped with Energas fuel gas treatment system. It consists of GS-FME-1700/3 gas treatment system and Enerproject EGSI-S-180/800WA booster compressor station. The project was developed by DneprVNIPIenergoprom Institute. After commissioning of cogeneration power station its annual electric power generation will be 126 000 MWh, thermal power – 177300 Gcal. The enterprise plans to cover the expenses during four years.

Turbines and Diesels       

Дата публикации: 
сб, 06/14/2014
Хранить в архиве: 
Xранить