Power station on the base of Turboden ORC turbine was built in Minsk, Byelorussia.

The contract for boiler-house reconstruction was signed with Minskkommunteploset State enterprise. Under the contract Turboden Srl manufactured and delivered 14CHP Nosplit ORC turbine rated at 1300 kW. The turbine operates in condensing mode. Working fluid is silicon oil. The project was developed by GSKB JSC (Brest).

Turbines and Diesels       

Дата публикации: 
пт, 01/16/2015
Хранить в архиве: 
Xранить