Energas Ltd. installed compressor station for gas turbines test rigs of Nevsky Plant.

EGSI-S-190/1500W booster compressor station will supply gas of necessary purity and temperature with pressure range of 1.5-4.3 MPa. The station will operate in fully autonomous mode. Booster compressor station was delivered to the site after factory testing. All components of the station are assembled on the single frame.

Turbines and Diesels       

Дата публикации: 
пн, 03/28/2016
Хранить в архиве: 
Xранить