Grodnoenergo RUP has finished the construction of Novogrudskaya wind park. Electric output of the wind park is 9 MW. At present it is the most powerful wind park in Byelorussia. It consists of five HW2/S1500 (87) and one HW82/1500 wind turbines each rated at 1.5 MW. Power equipment for the park was supplied by Huayi Electric Apparatus Group. The park was constructed near Grabniki settlement. General designer of the project is Belenergosetproject RUP, general contractor is Belelectromontazhnaladka RUP.