Новости

The customer of the project is Altaymyasoprom. Two power stations will be constructed on two various sites. First station with electric output of 1270 consists of two JMS 312 GS GE Jenbacher gas engine power plants. The second power station will comprise two JMS 612 GS power plants each rated at 2000 kW and two JMS 320 GS each rated at 1000 kW.

29/04/2013

Under the turn-key contract Energoteh Company will construct power station with total electric output of 4 MW for reliable power supply of the enterprise. Modular power station will consist of two MWM TCG 2020V20 gas engine power plants. They will be equipped with waste heat utilization systems. Furthermore, Energoteh will carry out modernization of electrical equipment and reconstruction of engineering communications and the construction of new electrical connections. The station will be equipped with automatic control system developed on the base of Energosoft hardware and software complex. The commissioning of the station is planned at the beginning of the next year.

26/04/2013

Alstom Renewable Power and Renova Energia, a leader in wind power generation in Brazil, signed the first contract, as part of the agreement announced in February 2013, to supply equipment to wind farms in Bahia State. Worth around €450 million, the contract was booked in fiscal year 2012/13. These farms will represent a capacity of 513 MW out of the 1,200 MW of the frame agreement. The equipment will be delivered from 2015 onwards and it will generate revenues starting into fiscal year 2014/15.

25/04/2013

Main power equipment of the station was supplied and commissioned by Revaho Agro Services BV (The Netherlands). It also developed the project of the station construction. The station operates in island mode without synchronization with MOESK power grid. 
The station consists of six GE Jenbacher JMS 620 F11 GS-N.LC gas engine power plants each rated at 3044 kW with thermal output of 3494 kW. The electric efficiency of each power plant is 43.8%, thermal efficiency is 50.3 %. Each power plant is equipped with waste heat utilization system. The main fuel for the station is natural gas.
To intensify the photosynthesis of the plants the station is equipped with COdiNOx system of CO2 purification and supply to the green-houses. Using of COdiNOx system gives the opportunity to reduce emission levels and to comply with strict ecological requirements.

24/04/2013

The station with electric output of 6 MW will generate electric power for the needs of field infrastructure. It will be the third station on the field. Two gas turbine power plants were commissioned on the site in July 2012. After commissioning of the third plant total electric output of the station will be increased up to 30 MW.

23/04/2013

Total electric output of the station will be 115 MW. The station will consist of two Siemens SGT-800 gas turbine plants each rated at 45 MW with electric generators, two ZiO JSC heat recovery steam generators and Siemens SST-400 steam turbine power plant rated at 38.5 MW. General contractor of the station construction is Energoproject JSC.

22/04/2013

Total electric output of the station will be 6 MW. All generated electric and thermal power will be used for the needs of the factory. The station will consist of three MWM TCG2020V20 gas engine power plants each rated at 2 MW. First stage of the station rated at 4 MW will be commissioned in November 2013, second stage – at the end of 2014. The cost of first stage construction is 133.9 million rubles. GPB-Energoeffect will realize the project on EPCM terms (engineering, procurement, construction management). After commissioning of the station the factory will have the opportunity to reduce prime cost of the production up to 40 %.

19/04/2013