Новости

Siemens and its consortium partner Bechtel have secured a $300m engineering, procurement and construction (EPC) contract for the 758MW Panda Temple II Power Project in Texas, US.

The natural-gas-fired combined-cycle power plant is scheduled to be completed in 2015 and will provide electricity to about 750,000 homes in the Central Texas area.

Under the deal, Siemens will provide power island equipment, including two SGT6-5000F gas turbines, a SST6-5000 steam turbine, two SGen6-1000A generators, and a SGen6-2000H generator for the project.

Siemens will also provide the SPPA-T3000 instrumentation and control system, as well as two Benson heavy duct-fired heat recovery steam generators manufactured by NEM.

05/04/2013

Spanish renewable energy company Iberdrola has commissioned the El Segredal and El Candal wind farms in the western region of Asturias.

Iberdrola's engineering subsidiary built and commissioned the wind power facilities, while Gamesa supplied the wind turbines, which stand at 67m-high with a rotor diameter of 80m.

Located between the towns of Castropol and Boal, the 38MW El Candal facility features 19 wind turbines.
The 36MW El Segregal facility is located in Villayón and features 18 wind turbines.
The combined capacity of the two facilities will be enough to power around 25,000 homes in Asturias.
Iberdrola said the electricity produced by both wind farms will help avoid the release of nearly 100,000 tonnes of CO2 emissions into the atmosphere each year.

03/04/2013

Alstom has secured an €85m contract from Bharat Heavy Electricals (BHEL) to provide components for a coal-fired power plant in Nabinagar, in the Indian state of Bihar.

Under the contract, Alstom will support BHEL in supplying components for three 660MW supercritical boilers for Nabinagar Power Generating Company (NPGCL).

Alstom will also help BHEL during the construction of the units, which are expected to be commissioned by 2017-18.
The company will develop key components, including pulverisers and airpreheater components, at its US manufacturing facilities, Wellsville and Concordia, as well as at Indian facilities in Durgapur and Shahabad.

25/03/2013

The park consists of thirty Vestas V112-3.0 wind turbines each rated at 3 MW. 
The second stage of the park will be put into operation up to the end of 2013. Total electric output of the park will be 200 MW.

22/03/2013

The station consists of Petra 1000 gas engine power plants with electric output of 700 kW and thermal output of 805 kW. The plant was supplied by Elteco. The plant was designed around MWM TCG 2016 V16 gas engine and Marelli MJB 400 LC4 electric generator.

21/03/2013

The station operates in combined cycle. It consists of two gas turbine plants developed on the base of Zorya-Mashproject GTD-15-02 gas turbines each rated 15 MW, two Pr-45-4.0-440 (P-86-I) heat recovery steam generators and T-12-3.6/0.12 steam turbine. Total electric output of the station is 97 MW.

20/03/2013

The project is realized under the contract with Gaspromneft-Vostok Ltd. It was developed by NG-Energo JSC. The complex will consist of six Energo-P1540/6.3(10.5) KN30 power plants each rated at 1540 kW. The station is equipped with fuel gas treatment unit. The construction of the station will be started in February 2013.

19/03/2013