Новости

Garuyshkinskoye oil field is situated in Kungursky District, Permsky Area. The customer of the station is PermTOTIneft JSC. Main power equipoment of the station was delivered by BPC Engineering Ltd. The station consists of Capston ENEX C800 and C1000 microturbine power plants. Total electric output of the station is 1800 kW. Main fuel for the station is associated petroleum, gas with hydrogen sulphide content of 0.02 %. The station is equipped with two booster compressor stations. The station operates in parallel with the main power grid.

Turbines and Diesels       

16/06/2015

The station consists of two GTES-2.5 power plant. They generate electric power for the needs of field infrastructure. Total electric output of the station is 5 MW. The customer is NOVATEK-Yurkharovskneftegas.

Turbines and Diesels       

12/06/2015

КТ-63-7.7 steam turbine plant was manufactured and supplie by Uralsky Turbine Plant. It will operate as a part of PGU-230 combined cycle power station together with Alstom GT13E2 gas turbine power plant.

The commissioning of PGU-230 is planned at the beginning of 2016. Total electric output of the station will be 230 MW, thermal output – 390 Gcal/h. Efficiency of power equipment of the station is 50 % in combined cycle and 33% in simple cycle. The station will have ultra low emission levels.

New up-to date equipemnt is installed at the station. The project is being realized in stages. At the beginning of the year the foundation of steam turbine was created.

11/06/2015

The units will be produced under the contract NOVATEK-Yurkharovneftegas. The commissioning of the units is planned in 2016. Iskra NPO will supply four GPA-16NK Ural each rated at 16 MW. The units are developed on the base of NK-16-18ST gas turbine supplied by KMPO JSC and Kazankompressormash centrifugal compressors with end gas-dynamic seal. The units will be installed in hangars.

10/06/2015

Three natural gas-fired combined cycle power plants - each powered by eight Siemens H-Class gas turbines - and up to 600 wind turbines will boost Egypt's power generation capacity by more than 50 percent compared to the currently installed base. Beginning in 2017, they will add power to the grid in stages and will add an additional 16.4 gigawatts in total to Egypt's national grid. This will support the country's rapid economic development and meet its growing population's demand for power. The volume of €8 billion is the single biggest order for Siemens up to now. Egyptian President Abdel Fattah El-Sisi and German Vice Chancellor Sigmar Gabriel witnessed the signing ceremony in Berlin, Germany.

09/06/2015

Complex reconstruction of Tsentralnaya TETs is one of priority projects of TGK-1 for the nearest years. The station will consist of two Siemens SGT-800 gas turbine plants and hot-water waste-heat boiler. Total electric power of the station will be 100 MW, thermal output will be 100 Gcal/h.

08/06/2015

Vestas has received a firm and unconditional order for 12 units of the V112-3.3 MW wind turbine for the Cancellara wind project in the southern province of Basilicata, Italy. The 40 MW order for has been placed by Eolica Cancellara SRL, a subsidiary of Energreen Holding Italia Spa, which is part of a Luxembourg investment entity operating in the clean energy market.

The order comprises the supply, electrical works and installation of the wind turbines, including the electrical infrastructure of the wind farm, as well as a 10-year Active Output Management (AOM) 5000 service agreement. Delivery of the wind turbines is scheduled for the fourth quarter of 2015, with commissioning planned for the first quarter of 2016.

Upon completion, the Cancellara wind power plant is expected to produce about 100,440 MWh annually, which corresponds to the residential electricity consumption of approximately 116,000 people in Italy. The V112-3.3 MW wind turbine is a variant of Vestas’ 3 MW platform aimed at improving energy production on high-wind sites.

05/06/2015