All works are carried out by Intertekhelectro. At present auxiliary modules of gas turbine plants are installed on the foundations. High-voltage tests of generator stator are finished. Auxiliary power transformers are installed on the foundations. Total electric output of Mayakovskaya TES is 160 MW. The station consists of two 6F.03 gas turbine power plants manufactured by Russian gas turbines Ltd. (Rybinsk). General contractor for the project is Intertekhelectro. The customer of the station is Kaliningradskaya Generation Ltd – joint venture between Rosneftegas JSC and Inter RAO PJSC. Project management fron customer side is realized by Inter RAO – Engineering Ltd.