Pipeline deliveries of Russian gas to China are carried out through Power of Siberia main gas pipeline. New compressor stations are being built to increase its capacity. 4 GPA-32 Ladoga gas pumping units produced by REP Holding JSC – the first and second stages of construction-will be installed at СS-5 Vasily Poyarkov (1st and 2nd stages) compressor station. Commissioning of compressor shop No. 1 consisting of two units is planned until the end of 2022. The equipment will be manufactured at the Nevsky Plant.